At Ruby Energy, we believe in empowering our customers to make the most of their renewable energy systems. With our Smart Export Guarantee (SEG), you can earn money by exporting excess electricity generated by your solar panels, wind turbines, or other eligible renewable sources back to the National Grid.

What Is the Smart Export Guarantee?
The Smart Export Guarantee is a government-backed initiative that requires energy suppliers to pay small-scale generators for the renewable electricity they export to the grid. This scheme is designed to encourage the adoption of renewable energy technologies and support the UK’s transition to a greener future.
Eligibility Criteria
To qualify for Ruby Energy’s SEG tariff, you must meet the following requirements:
- Location: Your renewable energy system must be located in Great Britain.
- Capacity: The total installed capacity should not exceed 5MW (or 50kW for micro-CHP systems).
- Certification: Your installation and installer must be certified under the Microgeneration Certification Scheme (MCS) or an equivalent scheme.
- Metering: You must have a meter capable of providing half-hourly export readings, typically a smart meter.
- Feed-in Tariff: You cannot receive SEG payments if you are already receiving export payments under the Feed-in Tariff scheme.
Our SEG tariff offers a competitive rate of 3 pence per kWh for every unit of electricity you export. This fixed-rate tariff provides a straightforward way to earn money from your renewable energy system.
A trusted partner
When you choose Ruby Energy, you’re choosing a partner you can rely on. With an Excellent Trustpilot rating and over 17,500 glowing reviews, our clients trust us to deliver reliable, efficient, and hassle-free energy solutions. We’re proud to have earned the confidence of thousands, and we’re committed to bringing the same level of care and expertise to your energy needs.
Why Choose Ruby Energy?
Transparent Rates: Our fixed-rate SEG tariff ensures you know exactly how much you’ll earn for your exported electricity.
No Import Tariff Switch Required: You can join our SEG tariff without changing your current electricity supplier.
Expert Support: Our team is here to guide you through the application process and answer any questions you may have.
Application Process
Applying for our SEG tariff is simple:
Obtain an Export MPAN: Contact your Distribution Network Operator (DNO) to request an export Meter Point Administration Number (MPAN). This process can take 1–4 weeks.
Submit Your Application: Once you have your export MPAN, complete our online application form and provide the necessary documentation, including your MCS certificate and proof of ownership.
Meter Reading: After your application is approved, we’ll ask for an initial meter reading and a photograph of your meter to confirm the reading.
Start Earning: Once everything is set up, you’ll begin receiving payments for the electricity you export to the grid.
What do I need to have to get SEG?
You get paid a fixed rate for any excess renewable electricity you export to the grid from sources such as:
- Solar PV
- A wind turbine
- A hydro system
- An anaerobic digestion system
- A micro combined heat and power system (micro-CHP)
- An anaerobic digestion system – Ofgem Confirmation of the ‘AD Reporting Start Date’